Data Centre

16
Dec

Equinix Harbour Exchange (HEX) – Fractional Racks

It has been brought to our attention by one of our partner companies that they have a limited availability of fractional racks in the Equinix Harbour Exchange (HEX) datacentre in the Docklands. There aren’t many available so firm interest should be lodged as soon as possible if this is of interest to you.

GCC HEX:

1/4 rack – 10U rack space
0.50kw power included

Set-up £500
Monthly £400

1/2 rack – 20U rack space
1KW power included
Set-up £900
Monthly £600

All prices exclude VAT, E&OE.

Get in touch if this is of interest.

7
Jul

Digital Realty – Sovereign House (ex-Telecity) Racks available

We have been advised by a partner company that has space in the ex-TeleCity Group (now Digital Realty) data-centre Sovereign House, which is based on Marsh Wall in London’s Docklands.

Space in this facility isn’t available very often and when it does become available it tends to get snapped up pretty quickly. There are 15 racks available on a first-come, first-served basis as follows:

Digital Realty Sovereign House Datacentre
15 racks – up to 5 adjacent racks available
Space in private cages
600mm x 900mm racks in situ currently. Footprints can take cabinets up to 1100mm racks.
8 amps per cabinet
A and B power supply
£950 per rack – £995 install
Unaccompanied access available
Simple remote hands included
Standard term 1 year

16a racks are also available if required.

To secure this offer – get in touch on 020 3002 7992 or e-mail sales@host-consult.net – but be quick! they won’t be available for long!

12
Apr

C4L, Selection Services rebrand – now CORETX

Greetings! Many would have been notified this morning by Castle Street Investments that C4L and Selection Services are to be rolled into a new brand, CORETX.

CORETX isn’t however new – it’s the name that C4L’s next generation network has been branded as over the last few years.

Here’s a note from Andy Ross:

Following on from my last email I wanted to let you know we are excited to officially announce that Castle Street Investments and its recently acquired subsidiaries of C4L and Selection Services have rebranded to CORETX. Today I will be providing more detail on our company ambitions to the public and press in London at Cloud Expo, if you will be at the event, please do come and visit us on stand 431.


The name CORETX reiterates our Data Centre and Network infrastructure at the CORE of our service to you. Our connectivity to UK data centres, access to Public Cloud, our DDoS platform, flexible bandwidth and speed of deployment are the foundation blocks that enable us to deliver a variety of exceptional services to you.


I want to take this opportunity to stress that this merge of companies poses only positive opportunities for you as our Partner as we are now in a position to help increase your service offering. Our Partner Network is still one of the largest priorities for us here at CORETX and we will continue to strive for the best service for you to provide for your customers.

11
Mar

18% of UK Colo customers ready to switch DC’s

Recent research carried out by a data-centre operator has shown that 18.6% of colo clients nationally are ready to switch data-centres.

The research, carried out by managed hosting and colocation company CoreIX, shows that the major complaint is unexpected charges levied by their DC’s and the lack of pricing transparency.

With more new entrants to the marketplace over the last 24 months and the range of options available across the new pre-existing operators and new entrants, alongside falling pricing across the arena and more boutique-style offerings from a number of the new independent operators means that there has never been a better time to re-evaluate your existing commitments. Host Consult are perfectly placed to offer our advice and our assistance if your company is one of the 18%.

Get in touch and let us aid you in ensuring you are aware of all the best that the marketplace has to offer.

Read more from Datacentre Dynamics:

18.6% of clients ready to switch datacentres

16
Feb

C4L acquired in £20.2m consideration

Hot off the press comes the news this morning that Host Consult partner company C4L have been acquired by Cable Street Investments.

Peter Rigg, Chairman of MXC said:

“It’s good to see MXC continuing to support its investee companies this way, having both originated and executed this transformative acquisition for Castle Street. The Board of Castle Street has a clear fix on the market opportunity and we have great confidence in their ability to deliver.”

We’d like to offer our firm congratulations to Matt Hawkins and the team at C4L and wish the new company all the best for the future.

12
Jan

Manchester Tier III aligned 3kW rackspace starting from £450/month incl. power

Good morning! We’ve heard of some astonishing pricing in a Tier III aligned facility in Manchester. Well worth a viewing.

• 1 x 42u Full Rack
• 3Kw Power
• 4hrs Remote Hands
• 10Mbit CDR
• No set up Fee

1 Rack £550 per month
2-5 Racks £500 per month per rack
5+ Racks £450 per month per rack

• All racks will include the deliverables above
• First order has to be placed before March 31st 2016
• Any subsequent orders will be honoured at the rates above
• Minimum 12 month contract

These would be housed in our Tier III, Manchester facility in Salford near Media City. Our site is carrier neutral with all the major players in the telco market including, SSE, BT, ZAYO, Level 3, Virgin and many more with connectivity directly to London exchanges.

Sound interesting? get in touch with Host Consult at sales@host-consult.net for more information

5
Jan

TeleCity HEX 8/9 Promotion – £275/kW (min 2kW)

Happy New Year to all clients, partners and visitors from the team at Host Consult Ltd.

We have had news from a partner company that they are currently offering full racks in the flagship TeleCity Harbour Exchange (HEX) 8/9 site at just £275/kW/month with a minimum commit of 2kW per rack. This offer is likely to be in place until the end of January so we would encourage our clients to act quickly to secure their space. This is some of the best TeleCity Harbour Exchange rack pricing that we have seen.

Please e-mail sales@host-consult.net for more information or give us a call on +44 (0) 20 3002 7992 and we would be happy to assist.

14
Dec

2 x 2kW Racks – THN, TFM3

We hear of an established ISP/Hosting Provider that has a couple of spare 2kW racks in THN, TFM3

These are available at £1350/month plus £500 set-up. Currently they are full Dell rack enclosures but can be replaced with racks of halfs/quarters if preferred.

Minimum twelve month contract, three months deposit.

E-mail sales@host-consult.net if any interest.

14
Dec

1Gbs – £250, 10Gbs, £2500 and DDoS protected transit starting from £1.50/Mbs

Good morning!

Our client has advised us that they are running a Christmas and New Year IP Transit promotion at present, which they have asked us to offer to our contacts, clients and website visitors.

Global IP Transit offer – UK and European premium IP transit blend available for a limited time only!

– Full port 1,000Mbps Global BGP @ £250
– Full port 10,0000Mps Global BGP @ £2500

Available at any of the following network POP’s:

London Telehouse North
London Telehouse East
London Telecity Sovereign House
London Telecity Harbour Exchange 6-7
London Telecity Harbour Exchange 8-9
London Telecity Meridian Gate
London City Reach / Tutis Point
Amsterdam EvoSwitch

Approximately 40% of the global routing table available via low-latency, directly peered routes with the remainder via top tier one providers, TeliaSonera and Tinet (GTT).

Terms

– 1yr contract term
– No overages (full ports only on this offer)
– Free setup (excluding cross-connects)
– Prices are +VAT where applicable

——-

DDOS Protection – Affordable UK and European DDOS protection – 500Gbps+

– 100Mbps Global BGP @ £150
– 500Mbps Global BGP @ £750
– Full port 1,000Mbps Global BGP @ £1,500
– Full port 10,0000Mps Global BGP @ £15,000

*All services include outbound traffic

London Telehouse North
London Telehouse East
London Telecity Sovereign House
London Telecity Harbour Exchange 6-7
London Telecity Harbour Exchange 8-9
London Telecity Meridian Gate
London City Reach / Tutis Point
Amsterdam EvoSwitch

Anycast UK and European DDOS mitigation available from just £150 per month with 500Gbps protection.

Need to know any more on the above? get in touch at sales@host-consult.net and we would be happy to advise and assist.

1
Dec

Acquisition trail part 1 – Virtus expands into Infinity?

Well, not quite, but they have acquired the Slough Facility from Infinity Data Centres, we hear today, as reported in a press-release from Virtus themselves

Virtus, who have seen excellent demand in it’s facilities in Enfield and Hayes, and had already been in the process of building their third London datacentre, have added this sizeable facility to their already strong prospectus.

With 9400 square meters of tech-space with 34MVA of power infrastructure already provisioned at the site, ‘LONDON4 is capable of being subdivided allowing clients to have anything from a rack in a shared space, to their own suite or data hall with dedicated power and cooling and also offers over 1,800m2 of office space for customer use.’

This acquisition now makes Virtus a major player in the UK data-centre market and will strengthen the companies position in competition with the impending new Telecity/Equinix entity which is envisaged to be completed once the latter companies divest sites as part of an agreement with courts in Europe.

Neil Cresswell, CEO, VIRTUS Data Centres said: “The market for high quality, innovative and customer friendly colocation services in London continues to be very buoyant for the right type of proposition. We have experienced strong demand for the unique offerings of VIRTUS LONDON1 and LONDON2 and are always looking for the right kind of sites to meet our ever-growing inventory requirements. We are committed to long term sustainable and scalable expansion and we were being asked by customers and prospects to offer additional locations, including Slough. – See more at: http://virtusdatacentres.com/virtus-data-centres-buys-infinity-slough-data-centre-business/#sthash.fDfIM6xz.dpuf

Read more here